Taha Construction Company operates one of Pakistan’s most impressive and comprehensive heavy machinery fleets, providing top quality construction equipment to major projects across the country on a need basis. Our machinery division has been a critical backbone for some of the most demanding construction and infrastructure projects in Pakistan, including Block 1 and Block 2 of the Thar Coal Power Plant, the Jhumpir Wind Power Plant, and major national highway projects. We maintain a vast fleet of over 100 machines spanning 15 different categories — from powerful excavators and massive cranes to road pavers and concrete pumps — ensuring we always have exactly the right equipment for your project requirements. All our machinery is sourced from world renowned brands and maintained to the highest operational standards by our dedicated technical maintenance team to ensure maximum uptime and performance on every project. We offer flexible machinery supply arrangements including short term, long term, and project based contracts — giving our clients the freedom to access the equipment they need without the burden of ownership costs. With Taha Construction’s machinery supply service, your project will always have the right machine, operated by a skilled operator, ready to deliver results.
Our excavator fleet consists of 25 machines across multiple models including EX-200 to 800 chain, EX 160 WD, JS 145, ZX 130W, and EX 100 — covering every excavation requirement from light trenching to heavy bulk excavation works. All our excavators are maintained in peak operational condition and operated by experienced and certified operators who prioritize safety and efficiency on every project site. We can deploy multiple excavators simultaneously to accelerate project timelines and meet the most demanding excavation schedules.
Our crane fleet includes 7 heavy lift cranes ranging from 25 tons to 200 tons capacity, along with 6 Mazda cranes for 10 to 15 ton lifts and 4 forklifts available in 3 ton and 5 ton capacities for material handling operations. We have provided crane services for wind turbine installation, power plant equipment lifting, and heavy structural steel erection on some of Pakistan’s most challenging construction and energy projects. Our crane operators are highly experienced and trained in safe lifting operations following international standards for all heavy lift operations.
Our road construction equipment fleet includes 12 road rollers in 12 ton and 18 ton capacities along with AR-56 road pavers for complete asphalt laying and compaction operations on highway and road construction projects. We have successfully deployed our road construction fleet on the Multan Sukkur Motorway project and multiple NHA highway projects delivering high quality asphalt roads that meet international pavement standards. Our experienced road construction operators ensure perfect compaction, smooth finish, and correct gradients on every road project.
Our dumper and loader fleet consists of 16 dumpers ranging from 900 CFT to 1150 CFT capacity and 15 shovel loaders including 966, 966D, 966E, 950B, and 950E models for complete material handling and earthmoving operations. These machines form the critical logistics backbone of any large construction project, ensuring continuous and efficient movement of materials, soil, and aggregate across project sites of any scale. We deploy our dumper and loader fleet in coordinated teams to maximize productivity and minimize project cycle times.
Our concrete equipment fleet includes 6 concrete transit mixers in 5 to 8 M3 capacity, 3 concrete pumps with 47 meter reach, and complete concrete batching support for large scale concrete pours on power plant, bridge, and building construction projects. We have provided concrete equipment for major projects including the Jhumpir Wind Power Plant foundation works and Kannup 2 project concrete pavement operations. Our concrete equipment operators ensure consistent mix quality and efficient placement for every concrete operation.
Our generator fleet includes 5 generators ranging from 25 KVA to 250 KVA capacity providing reliable temporary power supply for construction sites, remote project locations, and industrial facilities across Pakistan. We also supply 6 tankers with 12,000 litre capacity and 4 plane body trucks in 40 ton and 60 ton capacity for complete site logistics and fuel supply operations. Our power equipment ensures your project site maintains uninterrupted operations regardless of location or grid availability.
Our massive fleet is ready to deploy to your project site anywhere in Pakistan